Installation steps
1. Preparation
Subsurfaces must have sufficient stability and be dry, level and free of dust, silicone and grease. Brush off subsurfaces; if necessary, clean with a vacuum cleaner and wipe down. If necessary, apply a primer in the case of crumbling plaster or very fine dust.
2. Apply a line of adhesive
Position ORCON MULTIBOND on the subsurface to be bonded, roll it out and gradually stick it to the subsurface.
3. Remove the release film
Gradually remove the release film.
4. Detail: Sealing
Apply the membrane onto the adhesive strip, leaving slack for expansion so as to allow for relative motion between components. Rub firmly using the pro clima PRESSFIX application tool to secure the adhesive bond.
5. Detail: Membrane overlap
Stick membrane overlaps together using ORCON MULTIBOND; press the membranes firmly together using PRESSFIX.
6. Membranes in exterior use
ORCON MULTIBOND is waterproof and stable at temperatures up to 100 °C (212 °F). It can be used in a permanent and reliable manner in exterior applications to stick roofing underlays.
7. Tip: Use two lines of adhesive
Simply apply two lines of adhesive, one over the other, in the case of very rough subsurfaces.
8. Durability
ORCON MULTIBOND made from SOLID acrylate is very resilient and bonds tightly to suitable subsurfaces.